Published reports
Dossier
Every report Touchstone has published, in sequence. There is one.
| Epoch | Seq | State | Controls | Observed at (UTC) |
|---|---|---|---|---|
ustb-2026-08-17 |
1 | UNVERIFIABLE | 5 satisfied · 3 unevaluable | 2026-08-17T16:48:32.075003Z |
A report is bound to the control set it was signed under. Sequence 1 was evaluated under an eight-control set; the digest of that approval ledger is inside the signed report. The project has since approved a different, five-control set. It applies only to sequences published after it, and it is never shown against sequence 1.
A report can also name an earlier sequence it corrects. Sequence 1 corrects nothing.